Wellesley On The Park 11 Wellesley Street West, Toronto ON M5T 1P9 Photo 1 Wellesley On The Park 11 Wellesley Street West, Toronto ON M5T 1P9 Photo 2 Wellesley On The Park 11 Wellesley Street West, Toronto ON M5T 1P9 Photo 3 Wellesley On The Park 11 Wellesley Street West, Toronto ON M5T 1P9 Photo 4 Wellesley On The Park 11 Wellesley Street West, Toronto ON M5T 1P9 Photo 5 Wellesley On The Park 11 Wellesley Street West, Toronto ON M5T 1P9 Photo 6

No driving directions were found. Please adjust your search.

Commercial - Office

Wellesley On The Park -
  • Building Specifications
    Key Building Facts
    • Floors (above grade): 61 storey
    • 2nd Floor Square Footage: 22,470 sq.ft
    • 3rd Floor Space Footage: 23,605 sq.ft.
    Parking
    • Commercial Spaces: 73
    • Total Green P: TPA 134 spots
    • Total Secure Bike Stalls: Office Long Term (10) Office Visitor (10)
    Building Exterior
    • Finishes: Aluminum curtain wall system
    • Glazing: Insulated glazing with argon gas, with gradient ceramic
    frit pattern and intermittent frameless operable awning windows
    Elevator
    • Elevator Cabs: 2 dedicated office elevators
    • Services P2, P1, lobby, 2nd, 3rd floors
    • Speed: 1.02 m/s (200 fpm) as per specifications
    Common Area Washrooms
    • Stone countertop, porcelain wall and floor tiles, stainless steel
    partitions, exposed concrete slab ceilings
    Structural
    • Superstructure: Cast in place reinforced concrete slab structure
    with circular columns (within offices), columns are offset from
    the exterior wall providing uninterrupted vision glass in all
    offices
    Mechanical
    • Live Load: 2.4 Kpa
    • HVAC system: Variable air volume (VAC) system with central
    compartment units on each floor
    • Zones: 33 per floor
    • Heating: Capped/valved 3/4” hot water supply and return pipes
    Electrical
    • Vendor shall provide a 100A 120/208V single phase, three wire
    service with main breaker and 24 circuit electrical panel within
    each unit
    Life Safety
    • Emergency Power System: Base building diesel generator will
    provide power to life-safety building systems in the event of a
    power outage
    • Fire Protection: Vendor shall provide fire alarm system/evacuation
    speaker/pull station devices based on unfinished open concept
    • Sprinklers: Base building sprinklers to be installed to an open
    plan with coverage in accordance with NFPA 13, Light Hazard
    Coverage. Sprinklers to be installed with upright heads
    Communications
    • 35mm empty conduit from the ceiling of each office unit which
    shall go to the floor commercial electrical room backboard
    Unit Floors
    • Trowel finished concrete slab floor, smooth and level to industry
    standards and tolerances for slab floors?

Property Details

  • Property ID: 101337258
  • New Construction: No
  • Style: Office
  • Status: Active
Listed By James Lin of CENTURY 21 Leading Edge VIP Realty Inc.
in Service Agreement with CENTURY 21 Leading Edge Realty Inc., Brokerage*