Randy Ramadhin

Broker

Green Realty Inc., Brokerage*

151 Superior Blvd., Units 19-21

Mississauga, ONL5T 2L1

Office: 905-565-9565
Office Fax: 905-565-9522
Direct: 416-744-1366
Connected To More
Signed in as . Sign Out.

Highway 407 East and Durham Links

If you drive east past Brock, just north of Taunton, you’ll see that the construction has started Highway 407 East along Winchester. This highway will be a publicly owned toll road, operated by the province. The design and construction of this highway is expected to create and sustain roughly 13,000 jobs throughout the Durham Region. The highway will be constructed in two phases, from Brock Road in Pickering to Harmony Road in Oshawa. This first phase is expected to be completed by 2015. The second phase will be to Highway 35/115 in Peterborough by 2020.

Read More

Pin It